Randle Reef – Hamilton ON

ct7xewcxeaab5fm 1-1fc3451978

Randle Reef, just west of Stelco (U.S. Steel) property on the harbour, is the worst coal tar-contaminated site in Canada and its remediation is expected to take eight years. The plan involves building a 7.5-hectare steel containment structure over the worst part of the polluted area. Then, less contaminated sediment from a 50-hectare surrounding area will be dredged and pumped into the structure. Water will be removed from the captured sediment, and the structure will be capped and made into a port facility with green space. The containment facility is capable of holding enough coal tar sediment to fill FirstOntario Centre (formerly Copps Coliseum) three times.

READ MORE HERE.

Similar Posts
Harmonic Motion / Rete dei draghi
Aanischaaukamikw Cree Cultural Institute – Quebec
Interaval
Shim+Sutcliffe Ravine Guest House
Port Mann Bridge – Surrey, British Columbia
Komb House
Mitchell’s Gourmet Foods Executive Suite